HIGH QUALITY mine WITH SIGNIFICANT UPSIDE

QUICK FACTS

Ownership: 93%

Location: Ethiopia

Status: Production

Operation: Open Pit

Life of Mine: 15+ years

Commodity: Gold

The Kurmuk Mine is a transformational gold operation located in the Benishangul-Gumuz region of Ethiopia. The mine commenced production in the fourth quarter of 2026, following the successful commissioning of key processing infrastructure and connection to the national power grid. Kurmuk is expected to produce between 240,000 and 270,000 ounces of gold in 2027, increasing to approximately 300,000 ounces annually in 2028, with average annual production of approximately 300,000 ounces over its first four years. Based on Mineral Reserves, Kurmuk is expected to sustain average annual production of approximately 240,000 ounces over an initial 10-year mine life, at an all-in sustaining cost (AISC) of less than $950 per ounce. Supported by significant exploration potential across its extensive land package, the Company is targeting an extension of Kurmuk's mine life to at least 15 years, while pursuing opportunities to sustain higher production levels over the longer term.

The current project design encompasses the Dish Mountain and Ashashire deposits, with numerous exploration targets across the Kurmuk Mine’s expansive 1,450 km² exploration territory.


  • 2027 Guidance

    PRODUCTION (Koz Au)

    240 - 270

  • LOM

    MINE SITE ALL-IN SUSTAINING COSTS (US$/oz) 1,2

    <$950

  •  

    LOM Production (Koz Au)

    240

1  Please refer to Cautionary Notes on non-GAAP Measures.
2  For the purposes of calculating mine site all in sustaining costs at individual mine sites, the Company does not include an allocation of corporate and administrative and share based compensation expenses to the mine sites.

Mineral Reserves and Resources (as of December 31, 2025) 3

  • PROVEN & PROBABLE MINERAL RESERVES
    (Koz Au) 

    2,706

  • MEASURED AND INDICATED MINERAL RESOURCES
    (Koz Au)

    3,363

  • INFERRED MINERAL RESOURCES
    (Koz Au)

    217

3  Mineral Reserves and Mineral Resources are shown on a 100% basis, M&I Resources are inclusive of Mineral Reserves. Please see 2025 year end Mineral Reserves and Resources statement for additional detail.

TECHNICAL REPORTS

Download Technical Report